← Back to Cumbria
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Highfield Farm, St Bees - Wind Turbine

Operator CWE V27 Limited · Owner Constantine Wind Energy Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 10 November 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Highfield Farm, St Bees - Wind Turbine is a 0.2 MW wind farm 3.6 km north-west of Egremont, Cumbria, United Kingdom. Its planning application (4/24/2334/0F1) went to Cumberland on 30 September 2024 and was granted on 16 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

CWE V27 LIMITED (09534606), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Highfield Farm, St Bees - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1624, Crane topples on Scout Moor wind farm project, 97 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16242026Crane topples on Scout Moor wind farm project97 kmMajor
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire102 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm119 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
CWE V27 Limited
Owner
Constantine Wind Energy Limited
Location
Highfield Farm, St Bees, Egremont, Cumbria, CA22 2TY, United Kingdom
Planning authority
Cumberland
Planning application
4/24/2334/0F1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 4/24/2334/0F1, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 30 September 2024 Planning application submitted
  • 16 October 2025 Planning permission granted
  • 16 October 2028 Planning permission runs out

None found. The register holds no published incident that names Highfield Farm, St Bees - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Highfield Farm, St Bees - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Highfield Farm, St Bees - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Highfield Farm, St Bees - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2025.
Where is Highfield Farm, St Bees - Wind Turbine?
3.6 km north-west of Egremont, Cumbria, United Kingdom (postcode CA22 2TY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).