← Back to Cumbria

Solar · United Kingdom

Yeorton Hall Farm

Operator Green Energy UK Direct

Planning Permission Expired5 MWData checked 16 November 2026Source record dated 29 July 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Yeorton Hall Farm is a 5 MW solar farm on the edge of Egremont, Cumbria, United Kingdom. Its planning application (4/15/2377/0F1) went to Cumberland on 2 September 2015 and was granted on 24 May 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 11 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 91 energy sites within 40 km for Yeorton Hall Farm

Members see the sites and incidents around this one, and every record behind them.

GREEN ENERGY UK DIRECT LIMITED (07384535), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Green Energy UK Direct
Location
Land at Yeorton Hall Farm, Oaklands, Egremont, Cumbria, CA22 2NX, United Kingdom
Planning authority
Cumberland
Planning application
4/15/2377/0F1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 4/15/2377/0F1, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 2 September 2015 Planning application submitted
  • 24 May 2016 Planning permission granted
  • 24 May 2019 Planning permission expired

None found. The register holds no published incident that names Yeorton Hall Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Yeorton Hall Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Yeorton Hall Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Yeorton Hall Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 29 July 2020.
Where is Yeorton Hall Farm?
On the edge of Egremont, Cumbria, United Kingdom (postcode CA22 2NX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).