Solar · United Kingdom

Nailcote Farm

Operator Green Energy UK Direct

Application Refused18 MWData checked 16 November 2026Source record dated 9 February 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Nailcote Farm is a 18 MW solar farm on the edge of Balsall Common, West Midlands, United Kingdom. Its planning application (2014/1212) went to Solihull on 9 July 2014 and was refused on 3 November 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 60 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 11 other sites and 669 energy sites within 40 km for Nailcote Farm

Members see the sites and incidents around this one, and every record behind them.

GREEN ENERGY UK DIRECT LIMITED (07384535), dissolved, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Green Energy UK Direct
Location
Nailcote Farm, Nailcote Lane, Berkswell, Coventry, West Midlands, CV7 7DE, United Kingdom
Planning authority
Solihull
Planning application
2014/1212

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2014/1212, with what the planning evidence pack adds for this site.

Every application in Solihull · Alerts for applications and incidents near here

  • 9 July 2014 Planning application submitted
  • 3 November 2014 Planning permission refused

None found. The register holds no published incident that names Nailcote Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Nailcote Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nailcote Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nailcote Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 9 February 2015.
Where is Nailcote Farm?
On the edge of Balsall Common, West Midlands, United Kingdom (postcode CV7 7DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).