← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Cumberland

Haverigg Extension Wind Farm

Operational2.4 MWApplication 4/91/0463/0Submitted 29 May 1991Granted 8 August 1991

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
4/91/0463/0
Planning authority
Cumberland
County or area
Cumbria
Nation
England
Technology
Onshore wind
Capacity
2.4 MW
Status
Operational
Operator or applicant
The Wind Company
Location
Kirksanton Airfield Part of Hemplands Farm Haverigg Millom Cumbria
Turbines
4
First operating
1998
  • 29 May 1991 Planning application submitted
  • 8 August 1991 Planning permission granted
  • 1 July 1998 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1624, Crane topples on Scout Moor wind farm project, 63 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-16242026Crane topples on Scout Moor wind farm project63 kmMajor
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm110 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate119 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Haverigg Extension Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.