← Back to Wiltshire
Planning pack for this site, £295Other options

Solar · United Kingdom

North Allington Solar Farm - Solar Farm

Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited

Awaiting Construction10 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

North Allington Solar Farm - Solar Farm is a 10 MW solar farm 4.8 km north-west of Chippenham, Wiltshire, United Kingdom. Its planning application (PL/2024/09410) went to Wiltshire on 29 October 2024 and was granted on 26 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for North Allington Solar Farm - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries24 kmMajor
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol27 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels28 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Noventum Power Limited
Owner
O.Y. Nofar Energy Limited
Location
East of Battens Farm, Allington, Wiltshire, SN14 7BY, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2024/09410

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2024/09410, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 29 October 2024 Planning application submitted
  • 26 September 2025 Planning permission granted
  • 26 September 2028 Planning permission runs out

None found. The register holds no published incident that names North Allington Solar Farm - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has North Allington Solar Farm - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names North Allington Solar Farm - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of North Allington Solar Farm - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is North Allington Solar Farm - Solar Farm?
4.8 km north-west of Chippenham, Wiltshire, United Kingdom (postcode SN14 7BY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).