Battery storage · United Kingdom

Arleston Solar & Battery Energy Storage System

Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited

Application Submitted99.9 MWData checked 16 November 2026Source record dated 4 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Arleston Solar & Battery Energy Storage System is a 99.9 MW battery storage site on the edge of Sinfin, Derbyshire, United Kingdom. Its planning application (DMOT/2025/0113) went to South Derbyshire on 2 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 43 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arleston Solar & Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells38 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool111 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire131 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Noventum Power Limited
Owner
O.Y. Nofar Energy Limited
Location
Manor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN, United Kingdom
Planning authority
South Derbyshire
Planning application
DMOT/2025/0113

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DMOT/2025/0113, with what the planning evidence pack adds for this site.

Every application in South Derbyshire · Alerts for applications and incidents near here

  • 2 July 2025 Planning application submitted

None found. The register holds no published incident that names Arleston Solar & Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Arleston Solar & Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arleston Solar & Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arleston Solar & Battery Energy Storage System?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2025.
Where is Arleston Solar & Battery Energy Storage System?
On the edge of Sinfin, Derbyshire, United Kingdom (postcode DE73 7HN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).