Solar · United Kingdom
Arleston Solar & Battery Energy Storage System
Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited
Application Submitted43 MWData checked 16 November 2026Source record dated 4 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Arleston Solar & Battery Energy Storage System is a 43 MW solar farm on the edge of Sinfin, Derbyshire, United Kingdom. Its planning application (DMOT/2025/0113) went to South Derbyshire on 2 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 43 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Arleston Solar & Battery Energy Storage System changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arleston Solar & Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 38 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 38 km | Significant |
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 111 km | Major |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 131 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 43 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Noventum Power Limited
- Owner
- O.Y. Nofar Energy Limited
- Location
- Manor Farm, Arleston Lane, Arleston, Derby, Derbyshire, DE73 7HN, United Kingdom
- Planning authority
- South Derbyshire
- Planning application
- DMOT/2025/0113
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DMOT/2025/0113, with what the planning evidence pack adds for this site.
Every application in South Derbyshire · Alerts for applications and incidents near here
Timeline
- 2 July 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Arleston Solar & Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Arleston Solar & Battery Energy Storage System had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Arleston Solar & Battery Energy Storage System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Arleston Solar & Battery Energy Storage System?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2025.
- Where is Arleston Solar & Battery Energy Storage System?
- On the edge of Sinfin, Derbyshire, United Kingdom (postcode DE73 7HN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).