Solar · United Kingdom

Victory Park Way - Solar Panels

Operator Gardner Aerospace

Awaiting Construction1.3 MWData checked 16 November 2026Source record dated 1 March 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Victory Park Way - Solar Panels is a 1.3 MW solar farm in Sinfin, Derbyshire, United Kingdom. Its planning application (22/00242/FUL) went to Derby on 14 February 2022 and was granted on 31 March 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Victory Park Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby39 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge40 kmSignificant
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall48 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Gardner Aerospace
Location
9 Victory Park Way Derby, Derbyshire, DE24 8ZF, United Kingdom
Planning authority
Derby
Planning application
22/00242/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/00242/FUL, with what the planning evidence pack adds for this site.

Every application in Derby · Alerts for applications and incidents near here

  • 14 February 2022 Planning application submitted
  • 31 March 2022 Planning permission granted
  • 31 March 2025 Planning permission expired

None found. The register holds no published incident that names Victory Park Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Victory Park Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Victory Park Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Victory Park Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 March 2022.
Where is Victory Park Way - Solar Panels?
In Sinfin, Derbyshire, United Kingdom (postcode DE24 8ZF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).