Solar · United Kingdom
Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array
Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited
Application Submitted49.9 MWData checked 16 November 2026Source record dated 5 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array is a 49.9 MW solar farm 5.8 km east of Bideford, Devon, United Kingdom. Its planning application (1/0470/2025/FULM) went to Torridge on 30 July 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 38 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 40 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 40 km | Significant |
| EIR-1486 | 2026 | Fire under solar panels at Broadclyst brought under control | 55 km | Significant |
| EIR-1523 | 2026 | Fire damages solar panel batteries in a Teignmouth garage | 66 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Noventum Power Limited
- Owner
- O.Y. Nofar Energy Limited
- Location
- Bulworthy Farm Stoney Cross, Devon, EX39 4PY, United Kingdom
- Planning authority
- Torridge
- Planning application
- 1/0470/2025/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 1/0470/2025/FULM, with what the planning evidence pack adds for this site.
Every application in Torridge · Alerts for applications and incidents near here
Timeline
- 30 July 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 September 2025.
- Where is Bulworthy Farm, Stoney Cross - Solar Photovoltaic Array?
- 5.8 km east of Bideford, Devon, United Kingdom (postcode EX39 4PY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).