← Back to Devon
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Gammaton Barton Farm, Alverdiscott - Battery Energy Storage

Operator Torridge District Council

Awaiting Construction100 MWData checked 16 November 2026Source record dated 31 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Gammaton Barton Farm, Alverdiscott - Battery Energy Storage is a 100 MW battery storage site 3.6 km east of Bideford, Devon, United Kingdom. Its planning application (1/0268/2025/FULM) went to Torridge on 26 March 2025 and was granted on 17 July 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gammaton Barton Farm, Alverdiscott - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 57 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter57 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire174 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool278 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
100 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Torridge District Council
Location
Gammaton Barton Farm, Bideford, Devon, EX39 4QA, United Kingdom
Planning authority
Torridge
Planning application
1/0268/2025/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 1/0268/2025/FULM, with what the planning evidence pack adds for this site.

Every application in Torridge · Alerts for applications and incidents near here

  • 26 March 2025 Planning application submitted
  • 17 July 2025 Planning permission granted
  • 17 July 2028 Planning permission runs out

None found. The register holds no published incident that names Gammaton Barton Farm, Alverdiscott - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Gammaton Barton Farm, Alverdiscott - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gammaton Barton Farm, Alverdiscott - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gammaton Barton Farm, Alverdiscott - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
Where is Gammaton Barton Farm, Alverdiscott - Battery Energy Storage?
3.6 km east of Bideford, Devon, United Kingdom (postcode EX39 4QA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).