← Back to Wiltshire

Energy sites / United Kingdom / Wiltshire

Battery storage · United Kingdom

Tiddlywink Barn Battery Storage Power Plant

Abandoned20 MWChecked 6 October 2026Last changed in the dataset 14 June 2022

Technology
Battery storage (Stand-alone Storage)
Capacity
20 MW
Status
Abandoned
Operator or applicant
Mcballester Limited
Location
The Barn south east of 8 Tiddlywink, South From Yatton Keynell To Crossroads, Yatton Keynell, Chippenham, Wiltshire, SN14 7BY, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2021/07610

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 24 August 2021 Planning application submitted

None found. The register holds no published incident that names Tiddlywink Barn Battery Storage Power Plant. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.