New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine

Awaiting Construction1 MWChecked 6 October 2026Last changed in the dataset 2 September 2024

Technology
Onshore wind
Capacity
1 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
New Balance Athletic Shoes UK Ltd
Location
New Balance Athletic Shoes Uk Limited, Flimby To Maryport, Flimby, Maryport, Cumbria, CA15 8RX, United Kingdom
Planning authority
Cumberland
Planning application
FUL/2023/0047
Appeal reference
AP-0813
Turbines
1, 75 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 9 March 2023 Planning application submitted
  • 1 September 2023 Planning permission refused
  • 27 March 2024 Appeal lodged
  • 26 July 2024 Planning permission granted
  • 26 July 2024 Appeal granted
  • 26 July 2028 Planning permission expired

None found. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack sets out every comparable incident for one project, with sources. £295, by email in minutes.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.