← Back to Cumbria
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine

Operator New Balance Athletic Shoes UK Ltd

Awaiting Construction1 MWData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine is a 1 MW wind farm 3.9 km north of Workington, Cumbria, United Kingdom. Its planning application (FUL/2023/0047) went to Cumberland on 9 March 2023 and was granted on appeal on 26 July 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 93 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire93 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm102 kmMajor
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm110 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
New Balance Athletic Shoes UK Ltd
Location
New Balance Athletic Shoes Uk Limited, Flimby To Maryport, Flimby, Maryport, Cumbria, CA15 8RX, United Kingdom
Planning authority
Cumberland
Planning application
FUL/2023/0047
Appeal reference
AP-0813
Turbines
1, 75 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FUL/2023/0047, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 9 March 2023 Planning application submitted
  • 1 September 2023 Planning permission refused
  • 27 March 2024 Appeal lodged
  • 26 July 2024 Planning permission granted
  • 26 July 2024 Appeal granted
  • 26 July 2028 Planning permission runs out

None found. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
3.9 km north of Workington, Cumbria, United Kingdom (postcode CA15 8RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).