Wythegill Wind Turbine

Operator Airvolution Energy · Owner The Government Of Ireland

Operational2.3 MWData checked 16 November 2026Source record dated 16 June 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wythegill Wind Turbine is a 2.3 MW wind farm 3.8 km north of Workington, Cumbria, United Kingdom. Its planning application (2/2011/0259) went to Cumberland on 14 April 2011 and was granted on appeal on 11 October 2012. It has been operating since 15 June 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 29 other sites and 102 energy sites within 40 km for Wythegill Wind Turbine

Members see the sites and incidents around this one, and every record behind them.

AIRVOLUTION ENERGY LIMITED (07070240), dissolved, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Airvolution Energy
Owner
The Government Of Ireland
Location
Land at Wythegill Syke, Seaton, Workington, Cumbria, Cumbria, CA15 8RX, United Kingdom
Planning authority
Cumberland
Planning application
2/2011/0259
First operating
2015
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2011/0259, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 14 April 2011 Planning application submitted
  • 15 December 2011 Planning permission refused
  • 11 October 2012 Planning permission granted
  • 11 October 2012 Appeal granted
  • 15 March 2015 Construction started
  • 15 June 2015 Operational

None found. The register holds no published incident that names Wythegill Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Wythegill Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wythegill Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Wythegill Wind Turbine?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 June 2015.
Where is Wythegill Wind Turbine?
3.8 km north of Workington, Cumbria, United Kingdom (postcode CA15 8RX).