← Back to Cumbria

Energy sites / United Kingdom / Cumbria

Onshore wind · United Kingdom

Land at Flimby Hall Farm

Operational6.2 MWChecked 6 October 2026Last changed in the dataset 25 June 2013

Technology
Onshore wind
Capacity
6.2 MW
Status
Operational
Operator or applicant
Flimby Wind Energy Ltd
Location
Flimby, Maryport, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
2/2009/0418
Appeal reference
APP/G0908/A/09/2118993/NWF
First operating
2013
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 9 June 2009 Planning application submitted
  • 8 December 2009 Planning permission refused
  • 18 June 2010 Planning permission granted
  • 18 June 2010 Appeal granted
  • 1 April 2012 Construction started
  • 14 June 2013 Operational

None found. The register holds no published incident that names Land at Flimby Hall Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.