Onshore wind · United Kingdom
New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine
Operator New Balance Athletic Shoes UK Ltd
Application Withdrawn1 MWData checked 16 November 2026Source record dated 2 September 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine is a 1 MW wind farm 3.9 km north of Workington, Cumbria, United Kingdom. Its planning application (FUL/2024/0048) went to Cumberland on 18 March 2024 and was withdrawn on 6 August 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 32 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- New Balance Athletic Shoes UK Ltd
- Location
- New Balance Athletic Shoes Uk Limited, Flimby To Maryport, Flimby, Maryport, Cumbria, CA15 8RX, United Kingdom
- Planning authority
- Cumberland
- Planning application
- FUL/2024/0048
- Turbines
- 1, 75 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for FUL/2024/0048, with what the planning evidence pack adds for this site.
Every application in Cumberland · Alerts for applications and incidents near here
Timeline
- 18 March 2024 Planning application submitted
- 6 August 2024 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
- Where is New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
- 3.9 km north of Workington, Cumbria, United Kingdom (postcode CA15 8RX).