← Back to Cumbria

Onshore wind · United Kingdom

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine

Operator New Balance Athletic Shoes UK Ltd

Application Withdrawn1 MWData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine is a 1 MW wind farm 3.9 km north of Workington, Cumbria, United Kingdom. Its planning application (FUL/2024/0048) went to Cumberland on 18 March 2024 and was withdrawn on 6 August 2024. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 32 other energy sites within 10 km, 17 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 1 other site and 103 energy sites within 40 km for New Balance Athletic Shoes, Flimby To Maryport - Wind…

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
New Balance Athletic Shoes UK Ltd
Location
New Balance Athletic Shoes Uk Limited, Flimby To Maryport, Flimby, Maryport, Cumbria, CA15 8RX, United Kingdom
Planning authority
Cumberland
Planning application
FUL/2024/0048
Turbines
1, 75 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FUL/2024/0048, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 18 March 2024 Planning application submitted
  • 6 August 2024 Application withdrawn

None found. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is New Balance Athletic Shoes, Flimby To Maryport - Wind Turbine?
3.9 km north of Workington, Cumbria, United Kingdom (postcode CA15 8RX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).