Neuadd Goch Bank Wind Farm

Appeal Withdrawn27 MWChecked 6 October 2026Last changed in the dataset 26 March 2020

Technology
Onshore wind
Capacity
27 MW
Status
Appeal Withdrawn
Operator or applicant
RWE Npower Renewables
Location
Dolfor, Newtown Powys, Powys, United Kingdom
Planning authority
Powys
Planning application
P/2012/0040
Appeal reference
APP/T6850/A/14/2217488
Turbines
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 27 January 2012 Planning application submitted
  • 22 April 2014 Appeal lodged
  • 14 July 2014 Planning permission refused
  • 1 March 2020 Appeal withdrawn

None found. The register holds no published incident that names Neuadd Goch Bank Wind Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.