Onshore wind · United Kingdom

Neuadd Goch Bank Wind Farm

Operator RWE Npower Renewables

Appeal Withdrawn27 MWData checked 16 November 2026Source record dated 26 March 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Neuadd Goch Bank Wind Farm is a 27 MW wind farm 8.1 km south of Newtown, Powys, United Kingdom. Its planning application (P/2012/0040) went to Powys on 27 January 2012 and was refused on 14 July 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal withdrawn. There are 13 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 12 other sites and 75 energy sites within 40 km for Neuadd Goch Bank Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
27 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Withdrawn
Operator or applicant
RWE Npower Renewables
Location
Dolfor, Newtown Powys, Powys, United Kingdom
Planning authority
Powys
Planning application
P/2012/0040
Appeal reference
APP/T6850/A/14/2217488
Turbines
9

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2012/0040, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 27 January 2012 Planning application submitted
  • 22 April 2014 Appeal lodged
  • 14 July 2014 Planning permission refused
  • 1 March 2020 Appeal withdrawn

None found. The register holds no published incident that names Neuadd Goch Bank Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Neuadd Goch Bank Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Neuadd Goch Bank Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Neuadd Goch Bank Wind Farm?
Appeal Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 March 2020.
Where is Neuadd Goch Bank Wind Farm?
8.1 km south of Newtown, Powys, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).