Onshore wind · United Kingdom
Neuadd Goch Bank Wind Farm
Operator RWE Npower Renewables
Appeal Withdrawn27 MWData checked 16 November 2026Source record dated 26 March 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Neuadd Goch Bank Wind Farm is a 27 MW wind farm 8.1 km south of Newtown, Powys, United Kingdom. Its planning application (P/2012/0040) went to Powys on 27 January 2012 and was refused on 14 July 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal withdrawn. There are 13 other energy sites within 10 km, 9 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Neuadd Goch Bank Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 27 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Withdrawn
- Operator or applicant
- RWE Npower Renewables
- Location
- Dolfor, Newtown Powys, Powys, United Kingdom
- Planning authority
- Powys
- Planning application
- P/2012/0040
- Appeal reference
- APP/T6850/A/14/2217488
- Turbines
- 9
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2012/0040, with what the planning evidence pack adds for this site.
Every application in Powys · Alerts for applications and incidents near here
Timeline
- 27 January 2012 Planning application submitted
- 22 April 2014 Appeal lodged
- 14 July 2014 Planning permission refused
- 1 March 2020 Appeal withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Neuadd Goch Bank Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Neuadd Goch Bank Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Neuadd Goch Bank Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Neuadd Goch Bank Wind Farm?
- Appeal Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 March 2020.
- Where is Neuadd Goch Bank Wind Farm?
- 8.1 km south of Newtown, Powys, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).