Onshore wind · United Kingdom

Brechfa Forest West

Operator RWE Npower Renewables

Operational57.4 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brechfa Forest West is a 57.4 MW wind farm 17 km north-east of Carmarthen, Dyfed, United Kingdom. Its planning application (EN010008) went to The Planning Inspectorate - National Infrastructure on 4 November 2011 and was granted on 12 March 2013. It has been operating since 18 January 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds one incident at this site, the latest in 2026.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and the operator's 12 other sites for Brechfa Forest West

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
57.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
RWE Npower Renewables
Location
centred around the Afon Pib Valley, east of Alltwalis and the second area around Banc Llywelau, south of Rhydcymerau., Dyfed, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010008
First operating
2018
Turbines
28

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010008, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 4 November 2011 Planning application submitted
  • 12 March 2013 Planning permission granted
  • 24 November 2016 Construction started
  • 18 January 2018 Operational

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Brechfa Forest West had a fire or other incident?
Yes. The register holds one incident that names it: Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales (EIR-0874, 2026).
What is the status of Brechfa Forest West?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Brechfa Forest West?
17 km north-east of Carmarthen, Dyfed, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).