Onshore wind · United Kingdom
Brechfa Forest West
Operator RWE Npower Renewables
Operational57.4 MWData checked 16 November 2026Source record dated 4 September 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brechfa Forest West is a 57.4 MW wind farm 17 km north-east of Carmarthen, Dyfed, United Kingdom. Its planning application (EN010008) went to The Planning Inspectorate - National Infrastructure on 4 November 2011 and was granted on 12 March 2013. It has been operating since 18 January 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 4 other energy sites within 10 km. The register holds one incident at this site, the latest in 2026.
Incidents on the register at this site
On 25 February 2026 a blade detached from one of the 28 Senvion MM92 turbines at the 57.4MW Brechfa Forest West wind farm in Carmarthenshire, Wales. RWE said its team attended the site after discovering the detachment. The area was empty when the incident...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Brechfa Forest West changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 57.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- RWE Npower Renewables
- Location
- centred around the Afon Pib Valley, east of Alltwalis and the second area around Banc Llywelau, south of Rhydcymerau., Dyfed, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010008
- First operating
- 2018
- Turbines
- 28
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010008, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 4 November 2011 Planning application submitted
- 12 March 2013 Planning permission granted
- 24 November 2016 Construction started
- 18 January 2018 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Brechfa Forest West had a fire or other incident?
- Yes. The register holds one incident that names it: Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales (EIR-0874, 2026).
- What is the status of Brechfa Forest West?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
- Where is Brechfa Forest West?
- 17 km north-east of Carmarthen, Dyfed, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).