← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · The Planning Inspectorate - National Infrastructure

Brechfa Forest West

Operational57.4 MWApplication EN010008Submitted 4 November 2011Granted 12 March 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
EN010008
Planning authority
The Planning Inspectorate - National Infrastructure
County or area
Dyfed
Nation
Wales
Technology
Onshore wind
Capacity
57.4 MW
Status
Operational
Operator or applicant
RWE Npower Renewables
Location
centred around the Afon Pib Valley, east of Alltwalis and the second area around Banc Llywelau, south of Rhydcymerau.
Turbines
28
First operating
2018
  • 4 November 2011 Planning application submitted
  • 12 March 2013 Planning permission granted
  • 24 November 2016 Construction started
  • 18 January 2018 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0874, Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales, 9.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales9.8 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition45 kmMajor
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch61 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Brechfa Forest West is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in The Planning Inspectorate - National Infrastructure.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.