← Back to Powys
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Llandinam Windfarm Repowering and Extension

Operator Scottish Power (formerly CeltPower Ltd/Eurus Energy)

Awaiting Construction102 MWData checked 16 November 2026Source record dated 25 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Llandinam Windfarm Repowering and Extension is a 102 MW wind farm 11 km south-west of Newtown, Powys, United Kingdom. Its planning application went to Powys on 8 May 2008 and was granted on 7 September 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 14 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Llandinam Windfarm Repowering and Extension sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0790, Nordex attributes a Welsh wind turbine collapse to an overspeed condition, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition27 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales82 kmSignificant
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch95 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
102 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottish Power (formerly CeltPower Ltd/Eurus Energy)
Location
10km south of Newtown, Powys, United Kingdom
Planning authority
Powys
Turbines
34

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Powys · Alerts for applications and incidents near here

  • 8 May 2008 Planning application submitted
  • 7 September 2015 Planning permission granted
  • 7 September 2025 Planning permission expired

None found. The register holds no published incident that names Llandinam Windfarm Repowering and Extension. If you know of one, report it (confidential reports are anonymised).

Has Llandinam Windfarm Repowering and Extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Llandinam Windfarm Repowering and Extension; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Llandinam Windfarm Repowering and Extension?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 June 2020.
Where is Llandinam Windfarm Repowering and Extension?
11 km south-west of Newtown, Powys, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).