Onshore wind · United Kingdom
Bryngydfa Wind Farm
Operator Private Developer
Application Submitted36 MWData checked 16 November 2026Source record dated 16 September 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bryngydfa Wind Farm is a 36 MW wind farm 11 km south of Newtown, Powys, United Kingdom. Its planning application (P/2009/0384) went to Powys on 3 April 2009. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 7 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bryngydfa Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bryngydfa Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0790, Nordex attributes a Welsh wind turbine collapse to an overspeed condition, 35 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 35 km | Major |
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 87 km | Significant |
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 93 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 36 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Private Developer
- Location
- Felindre (Northern Area SO135809, South Knighton) Powys LD7 1Y, Powys, United Kingdom
- Planning authority
- Powys
- Planning application
- P/2009/0384
- Turbines
- 12
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2009/0384, with what the planning evidence pack adds for this site.
Every application in Powys · Alerts for applications and incidents near here
Timeline
- 3 April 2009 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Bryngydfa Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bryngydfa Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bryngydfa Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bryngydfa Wind Farm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 16 September 2014.
- Where is Bryngydfa Wind Farm?
- 11 km south of Newtown, Powys, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).