Mains Of Collithie

Operator Muirden Energy

Application Refused2.4 MWData checked 16 November 2026Source record dated 6 November 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mains Of Collithie is a 2.4 MW wind farm 27 km south-west of Turriff, Grampian, United Kingdom. Its planning application (APP/2014/1032) went to Aberdeenshire on 5 March 2014 and was refused on 25 August 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 16 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 220 energy sites within 40 km for Mains Of Collithie

Members see the sites and incidents around this one, and every record behind them.

MUIRDEN ENERGY LLP (SO302777), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Muirden Energy
Location
Land To South West Of Mains Of Collithie Gartly Huntly, Grampian, AB54 4PW, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2014/1032
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2014/1032, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 5 March 2014 Planning application submitted
  • 25 August 2014 Planning permission refused

None found. The register holds no published incident that names Mains Of Collithie. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mains Of Collithie had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mains Of Collithie; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Mains Of Collithie?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 November 2014.
Where is Mains Of Collithie?
27 km south-west of Turriff, Grampian, United Kingdom (postcode AB54 4PW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).