← Back to Berkshire

Solar · United Kingdom

Limberlost Farm

Operator Anesco · Owner Quanesco Midco Limited

Operational1.5 MWData checked 16 November 2026Source record dated 20 February 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Limberlost Farm is a 1.5 MW solar farm 3.2 km south-east of Thatcham, Berkshire, United Kingdom. Its planning application (12/02253/COMIND) went to West Berkshire on 14 September 2012 and was granted on 14 December 2012. It has been operating since 22 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 23 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 372 energy sites within 40 km for Limberlost Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Landfill Site Crookham Common Thatcham Berkshire, Berkshire, RG19 8DH, United Kingdom
Planning authority
West Berkshire
Planning application
12/02253/COMIND
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/02253/COMIND, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 14 September 2012 Planning application submitted
  • 14 December 2012 Planning permission granted
  • 22 March 2013 Operational

None found. The register holds no published incident that names Limberlost Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Limberlost Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Limberlost Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Limberlost Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 February 2014.
Where is Limberlost Farm?
3.2 km south-east of Thatcham, Berkshire, United Kingdom (postcode RG19 8DH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).