Solar · United Kingdom

Harrods Distribution Centre, Mill Lane - Solar Array

Operator Private Developer

Awaiting Construction1.6 MWData checked 16 November 2026Source record dated 10 March 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Harrods Distribution Centre, Mill Lane - Solar Array is a 1.6 MW solar farm on the edge of Thatcham, Berkshire, United Kingdom. Its planning application (22/02986/FULMAJ) went to West Berkshire on 8 December 2022 and was granted on 24 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 23 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Harrods Distribution Centre, Mill Lane - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing19 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet31 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Private Developer
Location
Harrods Distribution Centre, Unit 1, Mill Lane, Thatcham, Berkshire, RG19 4AL, United Kingdom
Planning authority
West Berkshire
Planning application
22/02986/FULMAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/02986/FULMAJ, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 8 December 2022 Planning application submitted
  • 24 February 2023 Planning permission granted
  • 24 February 2026 Planning permission expired

None found. The register holds no published incident that names Harrods Distribution Centre, Mill Lane - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Harrods Distribution Centre, Mill Lane - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Harrods Distribution Centre, Mill Lane - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Harrods Distribution Centre, Mill Lane - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2023.
Where is Harrods Distribution Centre, Mill Lane - Solar Array?
On the edge of Thatcham, Berkshire, United Kingdom (postcode RG19 4AL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).