Operational5 MWData checked 16 November 2026Source record dated 3 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gravel Works, Wasing Estate is a 5 MW solar farm 5.4 km south-east of Thatcham, Berkshire, United Kingdom. Its planning application (15/00557/COMIND) went to West Berkshire on 20 March 2015 and was granted on appeal on 9 June 2016. It has been operating since 1 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 379 energy sites within 40 km for Gravel Works, Wasing Estate

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
NESF (formerly INRG Solar)
Location
Land West Of Gravel Works, Station Road, Woolhampton, Reading, Berkshire, Berkshire, RG7 5S, United Kingdom
Planning authority
West Berkshire
Planning application
15/00557/COMIND
Appeal reference
APP/W0340/W/16/3141813
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00557/COMIND, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 20 March 2015 Planning application submitted
  • 18 September 2015 Planning permission refused
  • 4 February 2016 Appeal lodged
  • 9 June 2016 Planning permission granted
  • 9 June 2016 Appeal granted
  • 1 February 2017 Construction started
  • 1 March 2017 Operational

None found. The register holds no published incident that names Gravel Works, Wasing Estate. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gravel Works, Wasing Estate had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gravel Works, Wasing Estate; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gravel Works, Wasing Estate?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2017.
Where is Gravel Works, Wasing Estate?
5.4 km south-east of Thatcham, Berkshire, United Kingdom (postcode RG7 5S).