← Back to Cumbria

Solar · United Kingdom

Land between Orton Park Farm

Operator INRG Solar

Operational6.4 MWData checked 16 November 2026Source record dated 22 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land between Orton Park Farm is a 6.4 MW solar farm 3.8 km south-west of Carlisle, Cumbria, United Kingdom. Its planning application (15/0405) went to Cumberland on 11 May 2015 and was granted on 23 September 2015. It has been operating since 29 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 17 other sites and 140 energy sites within 40 km for Land between Orton Park Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
6.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
INRG Solar
Location
Land between Orton Park Farm, Newby West, Carlisle, Cumbria, CA2 6QY, United Kingdom
Planning authority
Cumberland
Planning application
15/0405
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0405, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 11 May 2015 Planning application submitted
  • 23 September 2015 Planning permission granted
  • 22 January 2016 Construction started
  • 29 March 2016 Operational

None found. The register holds no published incident that names Land between Orton Park Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land between Orton Park Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land between Orton Park Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land between Orton Park Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 March 2016.
Where is Land between Orton Park Farm?
3.8 km south-west of Carlisle, Cumbria, United Kingdom (postcode CA2 6QY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).