Solar · United Kingdom

Land At Penny Hill Lane

Operator Banks Renewables · Owner Onpath Energy Limited

Planning Permission Expired5 MWData checked 16 November 2026Source record dated 19 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land At Penny Hill Lane is a 5 MW solar farm 4.1 km north of Wales, South Yorkshire, United Kingdom. Its planning application (RB2015/1084) went to Rotherham on 11 August 2015 and was granted on 20 November 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 71 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 26 other sites and 589 energy sites within 40 km for Land At Penny Hill Lane

Members see the sites and incidents around this one, and every record behind them.

BANKS RENEWABLES (BOWBURN SOLAR PARK) LIMITED (13062412), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Banks Renewables
Owner
Onpath Energy Limited
Location
Land At, Penny Hill Lane, Ulley, Sheffield, South Yorkshire, S26 3YA, United Kingdom
Planning authority
Rotherham
Planning application
RB2015/1084

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2015/1084, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 11 August 2015 Planning application submitted
  • 20 November 2015 Planning permission granted
  • 20 November 2020 Planning permission expired

None found. The register holds no published incident that names Land At Penny Hill Lane. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land At Penny Hill Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land At Penny Hill Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land At Penny Hill Lane?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 19 June 2020.
Where is Land At Penny Hill Lane?
4.1 km north of Wales, South Yorkshire, United Kingdom (postcode S26 3YA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).