Planning pack for this site, £295Other options

Battery storage · United Kingdom

New South Farm, Piper Lane - Solar Farm

Operator Abei Energy Group

Application Submitted12 MWData checked 16 November 2026Source record dated 24 January 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

New South Farm, Piper Lane - Solar Farm is a 12 MW battery storage site on the edge of Wales, South Yorkshire, United Kingdom. Its planning application (RB2025/0029) went to Rotherham on 24 December 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 72 other energy sites within 10 km, 29 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ABEI ENERGY LIMITED (11974488), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for New South Farm, Piper Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells30 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool107 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire188 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Abei Energy Group
Location
New South Farm, Piper Lane, Aston, Sheffield, South Yorkshire, S26 2EF, United Kingdom
Planning authority
Rotherham
Planning application
RB2025/0029

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2025/0029, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 24 December 2024 Planning application submitted

None found. The register holds no published incident that names New South Farm, Piper Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has New South Farm, Piper Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New South Farm, Piper Lane - Solar Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of New South Farm, Piper Lane - Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2025.
Where is New South Farm, Piper Lane - Solar Farm?
On the edge of Wales, South Yorkshire, United Kingdom (postcode S26 2EF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).