Planning pack for this site, £295Other options

Battery storage · United Kingdom

Chesterfield Road, Swallownest - Battery Energy Storage

Operator Conrad Energy Developments Ii Limited · Owner Conrad Energy (Developments) Ii Limited

Application Submitted12 MWData checked 16 November 2026Source record dated 12 October 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Chesterfield Road, Swallownest - Battery Energy Storage is a 12 MW battery storage site on the edge of Beighton, South Yorkshire, United Kingdom. Its planning application (RB2023/1323) went to Rotherham on 22 September 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 81 other energy sites within 10 km, 32 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED (12886485), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chesterfield Road, Swallownest - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells30 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool106 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire187 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
12 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Conrad Energy Developments Ii Limited
Owner
Conrad Energy (Developments) Ii Limited
Location
Chesterfield Road, Swallownest, Sheffield, South Yorkshire, S26 4TL, United Kingdom
Planning authority
Rotherham
Planning application
RB2023/1323

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2023/1323, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 22 September 2023 Planning application submitted

None found. The register holds no published incident that names Chesterfield Road, Swallownest - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Chesterfield Road, Swallownest - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chesterfield Road, Swallownest - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chesterfield Road, Swallownest - Battery Energy Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 12 October 2023.
Where is Chesterfield Road, Swallownest - Battery Energy Storage?
On the edge of Beighton, South Yorkshire, United Kingdom (postcode S26 4TL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).