Operational49.9 MWData checked 16 November 2026Source record dated 27 May 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Nether Moor Field is a 49.9 MW battery storage site 4.8 km west of Maltby, South Yorkshire, United Kingdom. Its planning application (RB2017/1426) went to Rotherham on 29 September 2017 and was granted on 21 December 2017. It has been operating since 1 September 2020. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 69 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

591 energy sites within 40 km for Nether Moor Field

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Thurcroft Energy (Max Design Consultancy)
Location
Nether Moor Field, Green Lane, Thurcroft, Rotherham, South Yorkshire, South Yorkshire, S66, United Kingdom
Planning authority
Rotherham
Planning application
RB2017/1426
First operating
2020

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2017/1426, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 29 September 2017 Planning application submitted
  • 21 December 2017 Planning permission granted
  • 1 September 2020 Operational

None found. The register holds no published incident that names Nether Moor Field. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Nether Moor Field had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nether Moor Field; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nether Moor Field?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2020.
Where is Nether Moor Field?
4.8 km west of Maltby, South Yorkshire, United Kingdom (postcode S66).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).