Battery storage · United Kingdom

Thurcroft T-1 for 2022

Operator HC ESS7 LIMITED · Owner Hc Ess7 Limited

Operational48.9 MWData checked 16 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Thurcroft T-1 for 2022 is a 48.9 MW battery storage site 4.7 km west of Maltby, United Kingdom. Its status in the public dataset is operational. There are 68 other energy sites within 10 km, 31 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 2 other sites and 594 energy sites within 40 km for Thurcroft T-1 for 2022

Members see the sites and incidents around this one, and every record behind them.

HC ESS7 LIMITED (11463005), active, since 2018. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Battery)
Capacity
48.9 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Operational (Capacity Market unit, delivery year 2022, agreement awarded)
Operator
HC ESS7 LIMITED
Owner
Hc Ess7 Limited
Location
S66 9JD, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Thurcroft T-1 for 2022. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Thurcroft T-1 for 2022 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Thurcroft T-1 for 2022; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Thurcroft T-1 for 2022?
Operational, in the public dataset.
Where is Thurcroft T-1 for 2022?
4.7 km west of Maltby, United Kingdom (postcode S66 9JD).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).