← Back to Cumbria

Onshore wind · United Kingdom

Kirkby Moor Repowering

Operator RWE Renewables

Application Refused18 MWData checked 16 November 2026Source record dated 2 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kirkby Moor Repowering is a 18 MW wind farm 6.1 km north-west of Ulverston, Cumbria, United Kingdom. Its planning application (SL/2014/1220) went to Westmorland and Furness on 28 February 2015 and was refused on 26 November 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 15 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 2 other sites and 115 energy sites within 40 km for Kirkby Moor Repowering

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
RWE Renewables
Location
Land at Kirkby Moor Wind Farm, Kirkby-In-Furness, Cumbria, Cumbria, LA1 7, United Kingdom
Planning authority
Westmorland and Furness
Planning application
SL/2014/1220
Turbines
6, 115 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SL/2014/1220, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 28 February 2015 Planning application submitted
  • 26 November 2015 Planning permission refused

None found. The register holds no published incident that names Kirkby Moor Repowering. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kirkby Moor Repowering had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kirkby Moor Repowering; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Kirkby Moor Repowering?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2015.
Where is Kirkby Moor Repowering?
6.1 km north-west of Ulverston, Cumbria, United Kingdom (postcode LA1 7).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).