Onshore wind · United Kingdom

Furness Wind Farm/High Winds (Harlock Repowering)

Operator Baywind Co-op & Energy4All & Belltown Power

Operational11.5 MWData checked 16 November 2026Source record dated 4 June 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Furness Wind Farm/High Winds (Harlock Repowering) is a 11.5 MW wind farm 3.6 km north-west of Ulverston, Cumbria, United Kingdom. Its planning application (B06/2011/0662) went to Westmorland and Furness on 6 September 2011 and was granted on appeal on 24 July 2014. It has been operating since 17 November 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

117 energy sites within 40 km for Furness Wind Farm/High Winds (Harlock Repowering)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
11.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Baywind Co-op & Energy4All & Belltown Power
Location
Standish Cote & Mean Moor, Pennington, Marton & Harlock Hill, Ulverston, Cumbria, Cumbria, LA12 0, United Kingdom
Planning authority
Westmorland and Furness
Planning application
B06/2011/0662
First operating
2016
Turbines
5

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B06/2011/0662, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 6 September 2011 Planning application submitted
  • 21 May 2013 Planning permission refused
  • 24 July 2014 Planning permission granted
  • 24 July 2014 Appeal granted
  • 20 December 2015 Construction started
  • 17 November 2016 Operational

None found. The register holds no published incident that names Furness Wind Farm/High Winds (Harlock Repowering). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Furness Wind Farm/High Winds (Harlock Repowering) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Furness Wind Farm/High Winds (Harlock Repowering); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Furness Wind Farm/High Winds (Harlock Repowering)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2020.
Where is Furness Wind Farm/High Winds (Harlock Repowering)?
3.6 km north-west of Ulverston, Cumbria, United Kingdom (postcode LA12 0).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).