Offshore wind · United Kingdom
Awel y Mor Offshore Wind Farm
Operator RWE Renewables
Awaiting Construction775 MWData checked 16 November 2026Source record dated 31 March 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Awel y Mor Offshore Wind Farm is a 775 MW offshore wind farm 16 km north of Llandudno, United Kingdom. Its planning application (EN010112) went to The Planning Inspectorate - National Infrastructure on 20 April 2022 and was granted on 20 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Awel y Mor Offshore Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, offshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Awel y Mor Offshore Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 14 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0029, Second blade failure of 2024 at Dogger Bank A offshore wind farm, 222 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0029 | 2024 | Second blade failure of 2024 at Dogger Bank A offshore wind farm | 222 km | Significant |
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 222 km | Significant |
| EIR-1778 | 2018 | Engineer loses arm during repair at North Sea Siemens Gamesa turbine | 222 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 11 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Offshore wind
- Capacity
- 775 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- RWE Renewables
- Location
- 10.5 km off the coast of North Wales, To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm., Offshore, United Kingdom
- Planning authority
- The Planning Inspectorate - National Infrastructure
- Planning application
- EN010112
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for EN010112, with what the planning evidence pack adds for this site.
Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here
Timeline
- 20 April 2022 Planning application submitted
- 20 September 2023 Planning permission granted
- 20 September 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Awel y Mor Offshore Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Awel y Mor Offshore Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Awel y Mor Offshore Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Awel y Mor Offshore Wind Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
- Where is Awel y Mor Offshore Wind Farm?
- 16 km north of Llandudno, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).