← Back to Cumbria

Onshore wind · United Kingdom

Kirkby Moor

Operator Npower Renewables

Operational4.8 MWData checked 16 November 2026Source record dated 5 August 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kirkby Moor is a 4.8 MW wind farm 7.3 km north of Ulverston, Cumbria, United Kingdom. Its planning application (Unknown) went to Westmorland and Furness on 19 December 2014 and was granted on 13 June 2017. It has been operating since 1 January 1993. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 7 of them wind farms. The register holds one incident at this site, the latest in 2026.

Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.

The cause, the 1 linked record and the operator's 26 other sites for Kirkby Moor

Members see the sites and incidents around this one, and every record behind them.

NPOWER RENEWABLES AND CONSOLIDATION SERVICES LIMITED (02842079), dissolved, since 1993. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
4.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Npower Renewables
Location
approximately 4km from Ulverston, within a Site of Special Scientific Interest, Cumbria, United Kingdom
Planning authority
Westmorland and Furness
Planning application
Unknown
First operating
1993
Turbines
12

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for Unknown, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 1 January 1993 Operational
  • 19 December 2014 Planning application submitted
  • 13 June 2017 Planning permission granted

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kirkby Moor had a fire or other incident?
Yes. The register holds one incident that names it: Wind turbine fire at Kirkby Moor Wind Farm in Cumbria (EIR-0363, 2026).
What is the status of Kirkby Moor?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2019.
Where is Kirkby Moor?
7.3 km north of Ulverston, Cumbria, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).