Onshore wind · United Kingdom
Leithope Forest
Operator Npower Renewables
Application Withdrawn70 MWData checked 16 November 2026Source record dated 16 April 2008
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Leithope Forest is a 70 MW wind farm 25 km east of Hawick, Borders, United Kingdom. Its planning application went to Scottish Government (S36) and was withdrawn on 16 April 2008. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Leithope Forest changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
NPOWER RENEWABLES AND CONSOLIDATION SERVICES LIMITED (02842079), dissolved, since 1993. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 70 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Npower Renewables
- Location
- Leithope Forest, Scottish Borders, Borders, United Kingdom
- Planning authority
- Scottish Government (S36)
- Turbines
- 48
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 16 April 2008 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Leithope Forest. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Leithope Forest had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Leithope Forest; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Leithope Forest?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 16 April 2008.
- Where is Leithope Forest?
- 25 km east of Hawick, Borders, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).