Onshore wind · United Kingdom
Lowick Beacon
Operator Ecotricity
Application Refused4.2 MWData checked 16 November 2026Source record dated 11 September 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Lowick Beacon is a 4.2 MW wind farm 5.6 km north of Ulverston, Cumbria, United Kingdom. Its planning application (5/00/2278) went to Westmorland and Furness on 29 August 2000 and was refused on 30 March 2001. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 10 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Lowick Beacon changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
ECOTRICITY LIMITED (03043412), active, since 1995. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 4.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Ecotricity
- Location
- Lowick Beacon (village common), Cumbria, United Kingdom
- Planning authority
- Westmorland and Furness
- Planning application
- 5/00/2278
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 5/00/2278, with what the planning evidence pack adds for this site.
Every application in Westmorland and Furness · Alerts for applications and incidents near here
Timeline
- 29 August 2000 Planning application submitted
- 30 March 2001 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Lowick Beacon. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Lowick Beacon had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lowick Beacon; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Lowick Beacon?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 11 September 2011.
- Where is Lowick Beacon?
- 5.6 km north of Ulverston, Cumbria, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).