← Back to Cornwall

Solar · United Kingdom

Kellygreen Farm

Operator INRG Solar

Operational4 MWData checked 16 November 2026Source record dated 22 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kellygreen Farm is a 4 MW solar farm 8 km north-east of Wadebridge, Cornwall, United Kingdom. Its planning application (PA13/07973) went to Cornwall on 2 September 2013 and was granted on appeal on 23 June 2014. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 17 other sites and 223 energy sites within 40 km for Kellygreen Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
INRG Solar
Location
Land At Kellygreen Farm, St Kew, Bodmin, Cornwall, PL30 3DT, United Kingdom
Planning authority
Cornwall
Planning application
PA13/07973
Appeal reference
APP/D0840/A/14/2212325
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA13/07973, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 2 September 2013 Planning application submitted
  • 22 November 2013 Planning permission refused
  • 30 January 2014 Appeal lodged
  • 23 June 2014 Planning permission granted
  • 23 June 2014 Appeal granted
  • 5 February 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Kellygreen Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kellygreen Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kellygreen Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kellygreen Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 March 2016.
Where is Kellygreen Farm?
8 km north-east of Wadebridge, Cornwall, United Kingdom (postcode PL30 3DT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).