← Back to Cornwall

Solar · United Kingdom

Treswarrow Solar Park

Operator Private Developer

Operational6.5 MWData checked 16 November 2026Source record dated 31 March 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Treswarrow Solar Park is a 6.5 MW solar farm 5.7 km north of Wadebridge, Cornwall, United Kingdom. Its planning application (PA13/04287) went to Cornwall on 16 May 2013 and was granted on appeal on 20 October 2014. It has been operating since 18 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 8 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 206 energy sites within 40 km for Treswarrow Solar Park

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Private Developer
Location
Treswarrow, Trelights, Port Isaac, Cornwall, Cornwall, PL29 3TN, United Kingdom
Planning authority
Cornwall
Planning application
PA13/04287
Appeal reference
APP/D0840/A/14/2213107
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PA13/04287, with what the planning evidence pack adds for this site.

Every application in Cornwall · Alerts for applications and incidents near here

  • 16 May 2013 Planning application submitted
  • 25 October 2013 Planning permission refused
  • 11 February 2014 Appeal lodged
  • 20 October 2014 Planning permission granted
  • 20 October 2014 Appeal granted
  • 2 January 2015 Construction started
  • 18 March 2015 Operational

None found. The register holds no published incident that names Treswarrow Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Treswarrow Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Treswarrow Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Treswarrow Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2015.
Where is Treswarrow Solar Park?
5.7 km north of Wadebridge, Cornwall, United Kingdom (postcode PL29 3TN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).