Solar · United Kingdom
Hollandmey Renewable Energy Development
Operator Scottishpower Renewables · Owner Scottishpower Renewable Energy Limited
Awaiting Construction15 MWData checked 16 November 2026Source record dated 1 October 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hollandmey Renewable Energy Development is a 15 MW solar farm 18 km east of Thurso, Highland, United Kingdom. Its planning application (ECU00003353) went to Scottish Government (S36) on 19 November 2021 and was granted on 16 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hollandmey Renewable Energy Development changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hollandmey Renewable Energy Development sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 237 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 237 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 283 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 356 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Scottishpower Renewables
- Owner
- Scottishpower Renewable Energy Limited
- Location
- Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, Highland, KW14 8XH, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00003353
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00003353, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 19 November 2021 Planning application submitted
- 16 September 2024 Planning permission granted
- 16 September 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Hollandmey Renewable Energy Development. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hollandmey Renewable Energy Development had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hollandmey Renewable Energy Development; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hollandmey Renewable Energy Development?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2024.
- Where is Hollandmey Renewable Energy Development?
- 18 km east of Thurso, Highland, United Kingdom (postcode KW14 8XH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).