← Back to Highland
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Hollandmey Renewable Energy Development

Operator Scottishpower Renewables · Owner Scottishpower Renewable Energy Limited

Awaiting Construction50 MWData checked 16 November 2026Source record dated 1 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hollandmey Renewable Energy Development is a 50 MW wind farm 18 km east of Thurso, Highland, United Kingdom. Its planning application (ECU00003353) went to Scottish Government (S36) on 19 November 2021 and was granted on 16 September 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hollandmey Renewable Energy Development sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 210 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire210 kmMinor
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm210 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK210 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
50 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottishpower Renewables
Owner
Scottishpower Renewable Energy Limited
Location
Land At Hollandmey Farm And Ph, Phillips Mains, Mey, Thurso, Highland, KW14 8XH, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00003353
Turbines
10, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00003353, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 19 November 2021 Planning application submitted
  • 16 September 2024 Planning permission granted
  • 16 September 2029 Planning permission runs out

None found. The register holds no published incident that names Hollandmey Renewable Energy Development. If you know of one, report it (confidential reports are anonymised).

Has Hollandmey Renewable Energy Development had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hollandmey Renewable Energy Development; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hollandmey Renewable Energy Development?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2024.
Where is Hollandmey Renewable Energy Development?
18 km east of Thurso, Highland, United Kingdom (postcode KW14 8XH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).