Solar · United Kingdom
Hafod Y Gyfnes - Solar Panels
Operator Hydro Hafnant Cyf
Application Submitted0.5 MWData checked 16 November 2026Source record dated 29 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hafod Y Gyfnes - Solar Panels is a 0.5 MW solar farm 17 km east of Holyhead, Gwynedd, United Kingdom. Its planning application (FPL/2025/188) went to Isle of Anglesey on 27 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 10 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hafod Y Gyfnes - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hafod Y Gyfnes - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 2.4 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0752 | 2024 | Storm Darragh damages newly commissioned Anglesey solar farm panels | 2.4 km | Significant |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 9.8 km | Minor |
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 126 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Hydro Hafnant Cyf
- Location
- Hafod Y Gyfnes, Tyn Lon, Holyhead, Gwynedd, LL65 3LJ, United Kingdom
- Planning authority
- Isle of Anglesey
- Planning application
- FPL/2025/188
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for FPL/2025/188, with what the planning evidence pack adds for this site.
Every application in Isle of Anglesey · Alerts for applications and incidents near here
Timeline
- 27 August 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Hafod Y Gyfnes - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Hafod Y Gyfnes - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hafod Y Gyfnes - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hafod Y Gyfnes - Solar Panels?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2025.
- Where is Hafod Y Gyfnes - Solar Panels?
- 17 km east of Holyhead, Gwynedd, United Kingdom (postcode LL65 3LJ).