Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage

Operator Meenakeeran Wind Farm Limited

Application Submitted24 MWData checked 16 November 2026Source record dated 5 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage is a 24 MW wind farm 13 km north of Caernarfon, Gwynedd, United Kingdom. Its planning application (LA11/2025/0701/F) went to Isle of Anglesey on 30 September 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 11 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 95 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool95 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells215 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire236 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
24 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Meenakeeran Wind Farm Limited
Location
Townland of Meenakeeran, North of 109 - 124 Tullycar Road, Approximately 9.5km West/North West of Killeter, Gwynedd, LL77 7YR, United Kingdom
Planning authority
Isle of Anglesey
Planning application
LA11/2025/0701/F
Turbines
5, 150 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA11/2025/0701/F, with what the planning evidence pack adds for this site.

Every application in Isle of Anglesey · Alerts for applications and incidents near here

  • 30 September 2025 Planning application submitted

None found. The register holds no published incident that names Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 5 December 2025.
Where is Townland of Meenakeeran, Tullycar Road - Wind Farm & Battery Storage?
13 km north of Caernarfon, Gwynedd, United Kingdom (postcode LL77 7YR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).