Planning pack for this site, £295Other options

Battery storage · United Kingdom

W O Jones Printers - Energy Storage Facility

Operator Development At WO Jones Printers

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 2 September 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

W O Jones Printers - Energy Storage Facility is a 0.2 MW battery storage site 12 km west of Bangor, Gwynedd, United Kingdom. Its planning application (FPL/2024/154) went to Isle of Anglesey on 17 June 2024 and was granted on 1 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for W O Jones Printers - Energy Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 94 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool94 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells213 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire235 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Development At WO Jones Printers
Location
W O Jones Printers, Ffordd Ystad Ddiwydiannol, Industrial Estate Road, Llangefni, Gwynedd, LL77 7JA, United Kingdom
Planning authority
Isle of Anglesey
Planning application
FPL/2024/154

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FPL/2024/154, with what the planning evidence pack adds for this site.

Every application in Isle of Anglesey · Alerts for applications and incidents near here

  • 17 June 2024 Planning application submitted
  • 1 August 2024 Planning permission granted
  • 1 August 2029 Planning permission runs out

None found. The register holds no published incident that names W O Jones Printers - Energy Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has W O Jones Printers - Energy Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names W O Jones Printers - Energy Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of W O Jones Printers - Energy Storage Facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2024.
Where is W O Jones Printers - Energy Storage Facility?
12 km west of Bangor, Gwynedd, United Kingdom (postcode LL77 7JA).