← Back to Gwynedd
Planning pack for this site, £295Other options

Solar · United Kingdom

Cyngor Sir Ynys Mon - Solar Photovoltaic Panels

Operator Isle of Anglesey County Council

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 23 January 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cyngor Sir Ynys Mon - Solar Photovoltaic Panels is a 0.5 MW solar farm 12 km west of Bangor, Gwynedd, United Kingdom. Its planning application (FPL/2023/232) went to Isle of Anglesey on 17 October 2023 and was granted on 10 January 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 10 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cyngor Sir Ynys Mon - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 3.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels3.8 kmSignificant
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey8.7 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school122 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Isle of Anglesey County Council
Location
Cyngor Sir Ynys Mon, Isle Of Anglesey County Council, Llangefni, Gwynedd, LL77 7TW, United Kingdom
Planning authority
Isle of Anglesey
Planning application
FPL/2023/232

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FPL/2023/232, with what the planning evidence pack adds for this site.

Every application in Isle of Anglesey · Alerts for applications and incidents near here

  • 17 October 2023 Planning application submitted
  • 10 January 2024 Planning permission granted
  • 10 January 2029 Planning permission runs out

None found. The register holds no published incident that names Cyngor Sir Ynys Mon - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Has Cyngor Sir Ynys Mon - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cyngor Sir Ynys Mon - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cyngor Sir Ynys Mon - Solar Photovoltaic Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 January 2024.
Where is Cyngor Sir Ynys Mon - Solar Photovoltaic Panels?
12 km west of Bangor, Gwynedd, United Kingdom (postcode LL77 7TW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).