Onshore wind · United Kingdom
Glenkerie Wind Farm Extension
Operator Muirhall Energy (formerly Infinis)
Planning Permission Expired15 MWData checked 16 November 2026Source record dated 23 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Glenkerie Wind Farm Extension is a 15 MW wind farm 19 km south-west of Peebles, Borders, United Kingdom. Its planning application (13/00552/FUL) went to Scottish Borders on 14 May 2013 and was granted on appeal on 29 July 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 7 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Glenkerie Wind Farm Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Muirhall Energy (formerly Infinis)
- Location
- Kingledores Farm, Broughton, Biggar, Strathclyde, Borders, ML12 6QL, United Kingdom
- Planning authority
- Scottish Borders
- Planning application
- 13/00552/FUL
- Appeal reference
- PPA-140-2052
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/00552/FUL, with what the planning evidence pack adds for this site.
Every application in Scottish Borders · Alerts for applications and incidents near here
Timeline
- 14 May 2013 Planning application submitted
- 1 December 2014 Planning permission refused
- 5 March 2015 Appeal lodged
- 29 July 2015 Planning permission granted
- 29 July 2015 Appeal granted
- 29 July 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Glenkerie Wind Farm Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Glenkerie Wind Farm Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Glenkerie Wind Farm Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Glenkerie Wind Farm Extension?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
- Where is Glenkerie Wind Farm Extension?
- 19 km south-west of Peebles, Borders, United Kingdom (postcode ML12 6QL).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).