Onshore wind · United Kingdom
Bullamoor
Operator Muirhall Energy (formerly Infinis)
Planning Permission Expired8 MWData checked 16 November 2026Source record dated 23 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bullamoor is a 8 MW wind farm 4.5 km north-east of Northallerton, North Yorkshire, United Kingdom. Its planning application (08/04984/FUL) went to North Yorkshire on 19 December 2008 and was granted on 10 December 2010. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 9 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bullamoor changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Muirhall Energy (formerly Infinis)
- Location
- Northallerton, North Yorkshire. DL6, North Yorkshire, United Kingdom
- Planning authority
- North Yorkshire
- Planning application
- 08/04984/FUL
- Turbines
- 4, 132 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 08/04984/FUL, with what the planning evidence pack adds for this site.
Every application in North Yorkshire · Alerts for applications and incidents near here
Timeline
- 19 December 2008 Planning application submitted
- 10 December 2010 Planning permission granted
- 10 December 2015 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Bullamoor. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bullamoor had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bullamoor; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bullamoor?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
- Where is Bullamoor?
- 4.5 km north-east of Northallerton, North Yorkshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).