Dragon Long Meadow - Solar farm

Operator Dragon LNG Limited & Anesco Limited

Operational9.9 MWData checked 16 November 2026Source record dated 17 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dragon Long Meadow - Solar farm is a 9.9 MW solar farm on the edge of Milford Haven, Dyfed, United Kingdom. Its planning application (21/0986/PA) went to Pembrokeshire on 22 December 2021 and was granted on 14 January 2022. It has been operating since 13 March 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

89 energy sites within 40 km for Dragon Long Meadow - Solar farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
9.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Dragon LNG Limited & Anesco Limited
Location
Dragon LNG Meadow, The Land at West Perimeter Road, Milford Haven, Dyfed, SA73 1DN, United Kingdom
Planning authority
Pembrokeshire
Planning application
21/0986/PA
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/0986/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 22 December 2021 Planning application submitted
  • 14 January 2022 Planning permission granted
  • 13 March 2023 Operational

None found. The register holds no published incident that names Dragon Long Meadow - Solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dragon Long Meadow - Solar farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dragon Long Meadow - Solar farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dragon Long Meadow - Solar farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 January 2022.
Where is Dragon Long Meadow - Solar farm?
On the edge of Milford Haven, Dyfed, United Kingdom (postcode SA73 1DN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).