← Back to Dyfed

Energy sites / United Kingdom / Dyfed

Solar · United Kingdom

Dragon Long Meadow - Solar farm

Operational9.9 MWChecked 6 October 2026Last changed in the dataset 17 January 2022

Technology
Solar
Capacity
9.9 MW
Status
Operational
Operator or applicant
Dragon LNG Limited / Anesco Limited
Location
Dragon LNG Meadow, The Land at West Perimeter Road, Milford Haven, Dyfed, SA73 1DN, United Kingdom
Planning authority
Pembrokeshire
Planning application
21/0986/PA
First operating
2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 22 December 2021 Planning application submitted
  • 14 January 2022 Planning permission granted
  • 13 March 2023 Operational

None found. The register holds no published incident that names Dragon Long Meadow - Solar farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.