Battery storage · United Kingdom

Castle Terrace, Pill Road - Battery Energy Storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 31 March 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Castle Terrace, Pill Road - Battery Energy Storage is a 0.2 MW battery storage site in Milford Haven, Pembrokeshire, United Kingdom. Its planning application (25/0352/PA) went to Pembrokeshire on 28 July 2025 and was granted on 3 February 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Castle Terrace, Pill Road - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 153 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter153 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire213 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool235 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Castle Terrace, Pill Road, Milford Haven, Dyfed, Pembrokeshire, SA73 2NE, United Kingdom
Planning authority
Pembrokeshire
Planning application
25/0352/PA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/0352/PA, with what the planning evidence pack adds for this site.

Every application in Pembrokeshire · Alerts for applications and incidents near here

  • 28 July 2025 Planning application submitted
  • 3 February 2026 Planning permission granted
  • 2 February 2031 Planning permission runs out

None found. The register holds no published incident that names Castle Terrace, Pill Road - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Castle Terrace, Pill Road - Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Castle Terrace, Pill Road - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Castle Terrace, Pill Road - Battery Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 31 March 2026.
Where is Castle Terrace, Pill Road - Battery Energy Storage?
In Milford Haven, Pembrokeshire, United Kingdom (postcode SA73 2NE).