Onshore wind · United Kingdom
Dragon Energy Park - Wind Farm
Operator Dragon LNG
Under Construction14.4 MWData checked 16 November 2026Source record dated 24 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Dragon Energy Park - Wind Farm is a 14.4 MW wind farm 3.2 km east of Milford Haven, Dyfed, United Kingdom. Its planning application (CAS-01859-K1M7Y6) went to Welsh Government (NSIP) on 10 July 2023 and was granted on 30 October 2024. Construction started on 1 August 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 43 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Dragon Energy Park - Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dragon Energy Park - Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0874, Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales, 57 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 57 km | Significant |
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 105 km | Significant |
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 107 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 14.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Dragon LNG
- Location
- Land to the south of the Dragon LNG Terminal, Waterson, Milford Haven, Dyfed, SA73 1DR, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- CAS-01859-K1M7Y6
- Turbines
- 3, 150 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CAS-01859-K1M7Y6, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 10 July 2023 Planning application submitted
- 30 October 2024 Planning permission granted
- 1 August 2025 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Dragon Energy Park - Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Dragon Energy Park - Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Dragon Energy Park - Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Dragon Energy Park - Wind Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 24 February 2026.
- Where is Dragon Energy Park - Wind Farm?
- 3.2 km east of Milford Haven, Dyfed, United Kingdom (postcode SA73 1DR).