← Back to Tayside

Battery storage · United Kingdom

Cordon Farm, Abernethy - Battery Storage

Operator Elgin Energy EsCo Limited

Application Refused30 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Cordon Farm, Abernethy - Battery Storage is a 30 MW battery storage site 8.7 km south-east of Perth, Tayside, United Kingdom. Its planning application (24/01558/FLM) went to Perth and Kinross on 30 October 2024 and was refused on 18 August 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 28 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 18 other sites and 302 energy sites within 40 km for Cordon Farm, Abernethy - Battery Storage

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Elgin Energy EsCo Limited
Location
600 Metres North East Of Cordon Farm Abernethy, Tayside, PH2 9LN, United Kingdom
Planning authority
Perth and Kinross
Planning application
24/01558/FLM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01558/FLM, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Refused on 16 November 2026.

  • 30 October 2024 Planning application submitted
  • 18 August 2026 Planning permission refused

None found. The register holds no published incident that names Cordon Farm, Abernethy - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cordon Farm, Abernethy - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cordon Farm, Abernethy - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cordon Farm, Abernethy - Battery Storage?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Cordon Farm, Abernethy - Battery Storage?
8.7 km south-east of Perth, Tayside, United Kingdom (postcode PH2 9LN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).